Chute Construction Coldwater MI

Few places in construction are mistakes harder to correct than the surface of a concrete slab, so you've got to pay attention to the basics if you want to get the quality and finish your customers expect in Coldwater, whether it's a driveway, patio, or floor deck.

Local Companies

Bales Inc
(517) 278-3134
237 N Angola Rd
Coldwater, MI
C & L Asphalt Paving
(810) 984-4254
Smiths Creek, MI
County-Wide Construction Inc
(810) 744-1430
Burton, MI
Hoyle & Meyer Asphalt Repair Inc
(269) 372-2996
Kalamazoo, MI
Bolen Trucking
(989) 362-5011
875 Airport Rd
East Tawas, MI
Davison Asphalt Inc
(810) 653-6031
Davison, MI
Michigan Asphalt Paving & Sealcoating
(248) 645-2986
Birmingham, MI
Wolverine Asphalt Paving Inc
(248) 344-0834
Belleville, MI
Forum Cement Co
(734) 464-6656
36509 Kingsbury St
Livonia, MI
Omans Contracting Inc
(231) 854-1485
5025 S 184th Ave
Hesperia, MI

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: May 18, 2005

By Joe Nasvik

Few places in construction are mistakes harder to correct than the surface of a concrete slab, so you've got to pay attention to the basics if you want to get the quality and finish your customers expect, whether it's a driveway, patio, or floor deck.

The basics of finishing concrete start before you take the float out of your truck. First, you have to work closely with your supplier to order the right mix for your project. Then when the truck arrives, you must ensure it can move onto the site safely and effectively. Only then can you be in position to bring the mix to grade, strike-it off, float it, finish it, and cut control joints before you get it to cure properly and achieve good strength. This, of course, helps avoid serious finish failures like scaling and craze cracking. Those are harder to fix than a stud wall nailed to the deck in the wrong place.

Site Prep & Safety

Proper placement of the truck and chutes makes jobs safer, easier, and faster.

  • On average, the farthest distance concrete can be placed using a chute is 18 feet, measured from the truck's tires to the point of discharge.
  • The wheels of the ready-mix truck must be kept 1 foot away from below-grade walls and 1 foot away from excavations and trenches. (Rule of thumb: Stay 1 foot away from an excavation trench for each 1 foot of depth.)

Click here to read full article from Tools of the Trade

Featured Local Company

Farrell Executive Seacoating

517-768-1800
915 E South Street
Jackson, MI


Rss   Delicious   Digg   Add To My Yahoo   Add To My Google   Bookmark   Search Plugin

Topics:
Advertising Family Home Services Real Estate Resources
Business Services Fashion Industrial Goods & Services Retail & Consumer Services
Career Financial Services Insurance Software
Cars Food & Beverage Internet Technology
Computer Hardware Franchise Legal Telecommunications
Construction Health Miscellaneous Trade Shows
Education Holidays Nightlife Travel
Entertainment Home Appliances Online Database Weddings
Environmental Home Electronics Pets World History