Deck Remodeling Tips Shawnee OK

For signature work, think in circles. Adding a curve to a deck frame, and bending the decking and guardrail to match, is a sweet detail and an upsell. Or you can braid an S-curved deck board through the decking.

Local Companies

Patterson & Associates Inc
(405) 273-6031
8925 Acme Rd
Shawnee, OK
Peters Mike E
(405) 275-8007
12 Limousin Ln
Shawnee, OK
Renovations Inc
(918) 585-3242
1428 E 5th Ct
Tulsa, OK
Lowe's Home Improvement Warehouse of Moore
(405) 246-3581
5101 S I 35 Service Rd
Oklahoma City, OK
Home Depot the
(918) 299-3028
8880 S Delaware
Jenks, OK
Serenity Hospice of Claremore
(918) 341-8011
441 N Lynn Riggs Blvd
Claremore, OK
ABC Remodeling
(405) 307-0840
330 180th Ave NE
Norman, OK
AMC
(405) 525-0383
2000 NW 39th St
Oklahoma City, OK
Spinner Brothers Inc
(405) 232-5817
1216 Linwood Blvd
Oklahoma City, OK
Home Makeover of Oklahoma
(405) 949-1811
2500 N MacArthur Blvd
Oklahoma City, OK

Provided By:

Source: REPLACEMENT CONTRACTOR Magazine
Publication date: July 1, 2008

By Mark Clement

For signature work, think in circles. Adding a curve to a deck frame, and bending the decking and guardrail to match, is a sweet detail and an upsell. Or you can braid an S-curved deck board through the decking. The key component is cellular PVC, a growing decking category thanks to its durability, scratch- and split-resistance, and the fact that it bends well when heated. Here are some tips.

ROUND-FRONT DECKS

For shallow bends — nothing severe — you can cantilever the joists. A good rule of thumb is to limit the cantilever to less than one-eighth the span of the joist — I don't like to go more than 24 inches past the beam. You can beef up the joists to go a bit further, but make sure that the structure can support the overhang.

For deck sections of less than 12 feet wide, use the decking material to lay out the curve. Once you've determined where you want the bend to start and finish on the left and right band joists, mark it off by setting two nails. Pulling the on-edge deck board between them allows it to bend in a uniform circle segment. At the peak of the circle, drive a nail to pin the board in place.

Scribe the joists along the curve, cut off the ends, and install vertical blocking as backing for the front band wrap. Behind the vertical blocking, install blocks on the flat to support the heated decking while it cools after installation.

Click here to read full article from Replacement Contractor

Featured Local Company

H&H Garage Door INC.

405-799-3782
4211 se 112
moore, OK
www.hhgaragedoor.com


Rss   Delicious   Digg   Add To My Yahoo   Add To My Google   Bookmark   Search Plugin

Topics:
Advertising Family Home Services Real Estate Resources
Business Services Fashion Industrial Goods & Services Retail & Consumer Services
Career Financial Services Insurance Software
Cars Food & Beverage Internet Technology
Computer Hardware Franchise Legal Telecommunications
Construction Health Miscellaneous Trade Shows
Education Holidays Nightlife Travel
Entertainment Home Appliances Online Database Weddings
Environmental Home Electronics Pets World History