Installing metal roofing is a craft. It requires more skill and a greater knowledge than installing other roofing materials.An important consideration for properly installing standing seam roofing is proper cleat installation.

Local Companies

J&C ROOFING
918-686-8395
426 E OKMULGEE
MUSKOGEE, OK
Harrison's Roof Trusses of Coleman
(580) 937-4900
Coleman, OK
Great Plains Metals
(405) 324-2926
600 N Sara Rd
Yukon, OK
Parthenon Sales Corp
(405) 728-8132
8317 NW 107th St
Oklahoma City, OK
Dub's Sheet Metal
(405) 793-2976
9700 S Sunnylane Rd
Moore, OK
Statewide Sheet Metal & Trim
(405) 794-8746
Oklahoma City, OK
G A P Roofing Papermill
(918) 825-5969
Midamerica Industria
Pryor, OK
Mills Enterprise Inc
(405) 236-4470
308 N Rhode Island Ave
Oklahoma City, OK
United Building Products Inc
(405) 688-0100
5417 SW 29th St
Oklahoma City, OK
Sears Home Improvement Products
(918) 610-8131
3168 S 108th East Ave
Tulsa, OK

Provided by:

From ESE Machines



Installing metal roofing is a craft. It requires more skill and a greater knowledge than installing other roofing materials.

An important consideration for properly installing standing seam roofing is proper cleat installation. ESE Machines (www.esemachines.com) offers the following guidelines on its website.



How many cleats?

The rule of thumb is one (1) cleat should be responsible for every 1-1/2 square feet of roof area.

Therefore, the formula to get the total number of cleats required: Divide square footage of the roof area by 1.5 = number of cleats for that roof.



Cleat spacing considerations

Divide 216 by the width of your panel to determine cleat spacing because 216 is the number of square inches per 1-1/2 square feet. As an example, for a panel width of 18 inches, divide 216 by 18 = cleat spacing every 12 in.

Simply put:

— a 12-inch wide panel should have cleats every 18 inches

— an 18-inch wide panel should have cleats every 12 inches

— a 24-inch wide panel should have cleats every 9 inches



Perimeter areas are more critical!

The amount of fasteners used at the ridge, eaves and rakes should be doubled from the formula above. This means if you have a cleat every 12 inches up the roof then you should have two within 6 inches of each other at the eave, the ridge and every 6 inches along the rake.

Remember all perimeter details must be closed so no air can get under the panels.



Expansion Cleats

To minimize movement of roofing panels, a combination of fixed cleats and expansion cleats are required. The top part of an expansion cleat can slide back and forth in the base allowing the metal to expand and contract.



Sliding cleats

Low slope (or low pitch) roofs generally use longer panels than a steep roof. The longer the panel — the more linear expansion can be expected. To reduce the effect this has on the ridge or eave the fixed cleats should be placed in the center with expansion cleats on either side. This will split the expansion at each end in half.



Installing a low pitch

Since a medium pitch roof will usually be shorter there is less material expansion to deal with. The fixed cleats can be placed closer to the ridge — approximately 2/3 of the way up.



Installing a medium pitch

On steep roofs the fixed cleats can be placed at the ridge with the expansion cleats towards the eave.

From Metal Roofing Magazine

Featured Local Company

J&C ROOFING

918-686-8395
426 E OKMULGEE
MUSKOGEE, OK

Related Articles
- Closet Components Installation Muskogee OK
We recently decided to finish our walk-in closet with some custom closet components from EasyClosets. The walk-in closet design was really easy using the online design software that EasyClosets utilizes on their site. Once I placed the order the materials all showed up 3 days later.
- Cabinet Clamps Muskogee OK
- Before You Build That Top Muskogee OK
- Installation of Stone Countertops Muskogee OK
- Undercabinet Lighting Muskogee OK
- Proper Vents Muskogee OK
- Total House Construction Series Muskogee OK
- Roofing Watertightness Warranties Muskogee OK
- Bifold Doors Installation Muskogee OK
- Things To Consider In Shower Door Installation Muskogee OK
Related Articles
- Closet Components Installation Muskogee OK
We recently decided to finish our walk-in closet with some custom closet components from EasyClosets. The walk-in closet design was really easy using the online design software that EasyClosets utilizes on their site. Once I placed the order the materials all showed up 3 days later.
- Cabinet Clamps Muskogee OK
- Before You Build That Top Muskogee OK
- Installation of Stone Countertops Muskogee OK
- Undercabinet Lighting Muskogee OK
- Proper Vents Muskogee OK
- Total House Construction Series Muskogee OK
- Roofing Watertightness Warranties Muskogee OK
- Bifold Doors Installation Muskogee OK
- Things To Consider In Shower Door Installation Muskogee OK

Rss   Delicious   Digg   Add To My Yahoo   Add To My Google   Bookmark   Search Plugin

Topics:
Advertising Family Home Services Real Estate Resources
Business Services Fashion Industrial Goods & Services Retail & Consumer Services
Career Financial Services Insurance Software
Cars Food & Beverage Internet Technology
Computer Hardware Franchise Legal Telecommunications
Construction Health Miscellaneous Trade Shows
Education Holidays Nightlife Travel
Entertainment Home Appliances Online Database Weddings
Environmental Home Electronics Pets World History