Reducing Waste During Construction Jackson MI

One of the big topics in building green is reducing the amount of waste generated during the construction process. The average 2,000 sq. ft. home generates about 7,000 lbs of waste. That is 3.5 tons of wood, plastic, cardboard, metal and misc. other building products dumped into landfills for each 2,000 sq. ft.

Local Companies

R & K Construction Service Inc
(586) 421-0018
Warren, MI
Sole Construction Inc
(734) 729-6409
5940 Commerce Dr
Westland, MI
David Reed Construction
(313) 272-0474
10047 Mettetal St
Detroit, MI
Controlled Project Management
(517) 694-1109
5311 Harper Rd
Holt, MI
Austin A E Com
(269) 668-6513
54943 N Main St
Mattawan, MI
Evangelista Construction Co
(586) 726-8701
43455 Schoenherr Rd
Sterling Heights, MI
Construction Supply Inc
(231) 943-4002
657 W Blue Star Dr
Traverse City, MI
Hughes Design & Build Unique Structures L L C
(810) 678-3678
3875 High Point Dr
Metamora, MI
Grant Construction & Improvements
(734) 699-6628
354 Main St
Belleville, MI
Wolverine Construction Management
(616) 248-3001
4045 Barden St SE
Grand Rapids, MI

Provided By:

One of the big topics in building green is reducing the amount of waste generated during the construction process. The average 2,000 sq. ft. home generates about 7,000 lbs of waste. That is 3.5 tons of wood, plastic, cardboard, metal and misc. other building products dumped into landfills for each 2,000 sq. ft. (New Home Construction, Green Building Guidelines), home in America.

There are many ways to control the amount of waste generated on a job site. One of the ways that we've been able to drastically reduce waste is to have our wall panels built off-site at a local factory that specializes in pre-fabricated walls. The walls are built the same way we'd build them on-site with the exception that they are built in a factory under controlled conditions. The walls are all designed using specialized software that allows the builder to minimize the amount of waste and build the walls as efficiently as possible.

Another way we are reducing waste is by re-using damaged lumber for temporary bracing and blocking. By doing this we are using far less new lumber for bracing and blocking. Another great way to reduce waste is by using pre-engineered wood trusses. Again by building the trusses off-site in a factory the amount of waste material can be reduced. The trusses are very efficient structural members and use less material than a raftered or beam roof.

One of the easiest ways to help reduce the amount of waste put in landfills is by allowing the carpenters to take home left over scrap material that's suitable for burning. In this part of the country the scrap dimensional lumber makes for great kindling wood.

Tags: green building, home improvement, home improvement blog, reduced construction waste

Click here to read article at HomeConstructionImprovement.Com

Featured Local Company

J K Janiga Architects, Inc.

734.878.0177
10944 Frankfort
Pinckney, MI
www.jkjaniga.com


Rss   Delicious   Digg   Add To My Yahoo   Add To My Google   Bookmark   Search Plugin

Topics:
Advertising Family Home Services Real Estate Resources
Business Services Fashion Industrial Goods & Services Retail & Consumer Services
Career Financial Services Insurance Software
Cars Food & Beverage Internet Technology
Computer Hardware Franchise Legal Telecommunications
Construction Health Miscellaneous Trade Shows
Education Holidays Nightlife Travel
Entertainment Home Appliances Online Database Weddings
Environmental Home Electronics Pets World History